Premier Asphalt Repair

Parking Lot Striping

Half-day to 1 day for most commercial lots
How the work goes
Half-day to 1 day for most commercial lots
  • Parking stall layout per local code (9x18 feet standard)
  • ADA-compliant handicap space dimensions and placement
  • Fire lane, loading zone, and directional arrow marking
  • Stop bars and crosswalks where applicable
  • Traffic-grade paint or thermoplastic application
  • Dry to traffic in 1-2 hours (paint); immediate (thermoplastic)

Striping is layout and paint. Premier Asphalt Repair measures the lot, marks out parking stalls at the width and length required by local code—typically 9 feet wide by 18 feet deep for standard spaces, wider for accessible spaces. Handicap stalls have to meet ADA dimensions and be located on accessible routes with compliant slopes.

We mark fire lanes, loading zones, directional arrows, stop bars at intersections, and crosswalks if the lot connects to pedestrian routes. Everything gets laid out with chalk or temporary paint first, then we apply the permanent markings.

Paint lasts 12-18 months in high-traffic areas. Thermoplastic costs more up front but lasts 3-5 years.

Paint is the standard option—traffic-grade latex or alkyd paint applied with a striping machine. It lasts 12-18 months in high-traffic areas, longer in low-traffic sections. Thermoplastic is the upgrade—heat-applied plastic that bonds to the asphalt and lasts 3-5 years. Costs more up front but you're not re-striping every year.

We don't stripe fresh asphalt until it's cured—usually 5-7 days after paving. The oils in new asphalt will bleed through paint if you stripe too early. For re-striping over old asphalt, we can work as soon as the surface is clean and dry.

Striping work happens fast—most commercial lots take half a day to a day depending on size and complexity. We cone off sections as we work so the lot stays partially accessible. Paint is dry to touch in 30 minutes, ready for traffic in an hour or two depending on temperature and humidity.

Premier Asphalt Repair handles striping for retail centers, office complexes, churches, schools, and industrial facilities across Greater Smith County. New lot striping after paving, re-striping when the old markings have worn, ADA-compliant layout for accessible spaces—we bring the equipment and the knowledge of local code requirements.

Ready to start your parking lot striping?

Call Now Free Quote